Smiffy's Women's Curves 50's Pin Up Polka Dot Adult Retro Costume

Smiffy's Women's Curves 50's Pin Up Polka Dot Adult Retro Costume

SKU: SKU: S24455L
Sale Price Value: 0 Sale Price Number: 0 Website Price Value: 0 Website Price Number: 0 All Metafields: {}
Regular price $49.99
Regular price Sale price $49.99
Size

Low stock: 1 left

Authorized dealer
HalloweenStore.com

Genuine OEM product.

  1. Next day Shipping Mon–Fri
  2. Final sale No returnsPolicy

Final sale. This item cannot be returned or exchanged. All warranty claims must be made with the manufacturer directly.

View full details

Product Information

Description

The 50s Costume comes complete with the Black and White Polka dot Bodycon Dress with the attached Cropped Red Cardigan with Black Buttons. Completing the Look is the White Belt featuring the Circular Black Buckle and Flower Headpiece.

Size Guide

Size Fits Dress Size Bust Waist Hip
Large 14-16 40-42" 32-34" 42.5-44.5"
1X 18-20 44-46" 36-38" 47-49"
2X 22-24 48-50" 40-42" 51-53"
3X 26-28 51-53" 43-46" 54-56"

Additional Info

Category Seasonal Halloween Costumes & Accessories
SKU S24455L
MPN
Manufacturer HalloweenStore.com
Weight 3.0 lb